On-site renewable energy will be generated through the 913 panel PV (photovoltaic) array. In assessing the project energy needs during design, the team realized a large roof area would be required to meet energy demands. The large PV array was incorporated as a key design feature of the building.
Start Date
Display Date
May 2019
